PFE Ventilation Project

The Pretreatment and Flow Equalization (PFE) Ventilation Project is located at the summit of Stevens Pass in the District's Pretreatment Flow Equalization (PFE) building. The project needs to be completed by October 15, 2025.

The project removes existing air handling unit and moves to other side of the building for safety and ease of maintenance. The scope shall include: Disconnect and remove existing air unit and associated electrical appurtenances. Install mechanical louvre in hole left by the air handling unit removal. Install air handling unit on other side of building above the landing in a manner that allows the motor and belts to be accessible for maintenance. For details, please see Fan Relocation.pdf below.

This is a small works project and all public works requirements need to be met, including prevailing wages, intent, affidavit and retainage.

Please submit bids to Business.Mgr@StevensPassSD.org by 12:00PM on July 25, 2025.